Quality control for industrial construction, bridges and terminals
Record snags on the drawings, track close-out and manage quality on any project — from a factory to an airfield.

Suitable for any project that has a drawing
A drawing is enough to run control the same way as on a residential scheme.
- 01Factories and production sites
- 02Ports and logistics terminals
- 03Bridges and engineering structures
- 04Airfields and runways
- 05Substations and energy projects
- 06Oil and gas infrastructure
Industrial-grade reliability
Scale does not change the principle, but it does change what the system has to handle.
Snags on complex drawings
Working with large plans and several layers of documentation.
Health and safety
Safety breaches are recorded as their own type of issue.
On-premises
Deployment on company servers when data cannot leave the perimeter.
ERP integration
Snag data is passed into the plant’s accounting systems.
Contractor control
The quality of each organisation on site is visible.
Stages and schedule
Snags are linked to work stages and their completion dates.
Who works on site
An industrial project has more participants and harder boundaries of responsibility.
- 01
QA engineer
Raises snags and runs quality control.
- 02
Construction manager
Tracks close-out and deadlines.
- 03
Client representative
Gets online access to the state of the site.
- 04
Health and safety engineer
Works with safety breaches.
- 05
Regulatory inspection
Receives the digital trail without interfering in the process.
What it delivers
The larger the project, the more a lost snag costs.
- Defects are recorded with an exact location
- Safety breaches reach the responsible people immediately
- Contractors become comparable on quality
- Data stays inside the company perimeter
- Stage acceptance runs on documents, not on memory
Let’s discuss your project and your deployment requirements