Inspection software for infrastructure and public projects
Snags, photos, deadlines and owners are recorded formally, in line with documentation and information security requirements.

Suitable for construction and capital investment projects
Where control has to be evidenced by a document rather than a chat thread.
- 01Schools, nurseries and clinics
- 02Healthcare facilities
- 03Infrastructure: bridges, roads, stations
- 04Government and departmental estates
- 05Major refurbishment of public buildings
Contractor control by procedure, without paper or chat threads
Every action leaves a record that stands up in reporting and audit.
Snags on the drawing
It is clear where the breach is and who has to close it.
Reporting and exports
PDF and Excel, plus export into external document management systems.
Separated responsibilities
Contractor, supervisor and expert review each work in their own role.
Schedule control
Snags are linked to the works programme.
Photo evidence
Every defect and deviation is documented.
Security and on-premises
Deployment inside the client’s perimeter, agreed with the security team.
Everyone sees their own part and carries responsibility
The roles mirror the real control structure on a public project.
- 01
Supervision engineer
Raises snags and runs oversight.
- 02
Contractor
Closes out the work and uploads the evidence.
- 03
Expert review
Follows progress without interfering in the process.
- 04
Authority or client
Receives the report and the full digital trail.
What the client gains
Control becomes reproducible and verifiable.
- Every snag is backed by a photo and a date
- Reporting comes out of the system rather than being assembled by hand
- Responsibility for close-out is attached to a person
- Data can be held inside the client’s own perimeter
- The site history is available during audits and disputes
Let’s discuss your requirements and the deployment procedure

