Results of the rollout
What changes on projects where quality control runs in MonStr: handover, rework, penalties and inspector time. Figures are observations on CDS group projects.

Six blocks of work
Where automation pays off — by block, not “in general”. Figures marked * are observations.
Construction acceptance
5–15% saved on the budget of a residential complex or a road.*
Flat handover
40% faster handover with no conflicts with buyers.*
Penalty tracking
10–20% less rework and 90% lower litigation risk.*
Retentions
Retentions are tracked on every snag, not remembered at payment time.
Concealed works
Sign-off in 1 day instead of 3–5; defect rate 5% instead of 20%.*
BIM viewer
Quality snags are logged visually, right on the 3D model.
Where the figures come from
How we got them — honestly.
- 1
Our own projects
The figures come from CDS group projects where MonStr is used every day.
- 2
No control group
These are before-and-after observations, not a controlled study.
- 3
Your own estimate
In the demo we will recalculate the effect for your volumes: units, sites, inspectors.
In figures
- 90 sec
- average time to log a snag*
- 30 sec
- per snag with AI instead of a minute*
- 1 hour
- a week on penalties instead of 5–10*
- 40%
- faster flat handover*
* Observations on our own projects, without a control group.
What else changes
Hard to measure, but noticeable at once.

- Snags are not lost in chats or on paper
- A client report takes minutes, not an evening
- You see which contractors cause more defects
- A dispute is settled with a link to the record
- An inspector handles more sites without losing quality
- Every site has a complete history
Let’s estimate the effect on your projects